PRESS RELEASE                                                                            FOR IMMEDIATE RELEASE

 Media Contact:  Donna Gilmore, SanOnofreSafety.org
                               949-204-7794  dgilmore@cox.net
 
Updated 2/22/2015 with this link to Official Transcript of 10/27/2014 NRC San Onofre Decommissioning meeting
 
San Onofre’s Decommissioning Plan is not what it’s cracked up to be
Are the nuclear waste dry storage canisters at San Onofre cracking?
No one knows, but Edison wants to buy more of these inferior canisters.
 

NUHOMS 32PTH canisterOctober 27, 2014 (Carlsbad, CA) – The Nuclear Regulatory Commission (NRC) should not approve Southern California Edison’s San Onofre Decommissioning Plan.[1]  Edison plans to use dry storage canisters designed for temporary short term storage for long-term indefinite storage. The mission has completely changed but the canisters have not. The thin steel canisters Edison is proposing are vulnerable to cracking within a few years and there is no way to know if they have cracks and the cracks cannot be repaired. Canisters with cracks cannot be stored or moved safely.

The NRC has scheduled a public meeting today from 6:00 p.m. to 9:00 p.m., to receive public comments on this plan. Meeting location is the Omni La Costa, Poinsettia Ballroom, 2100 Costa Del Mar Road in Carlsbad.

The NRC recently approved leaving the tons of highly radioactive nuclear waste at San Onofre and all other nuclear plants in the nation for 60 years (short-term), 100 years (long-term) and indefinitely. Edison’s plan does not address this new reality.

A 2014 partial surface inspection of a two year old Diablo Canyon nuclear waste dry storage canister found conditions for stress corrosion cracks – a low enough temperature for ocean salts to corrode and crack the ½” thick stainless steel canister.[2] The NRC originally said it would be at least 30 years before cracking might occur.[3]    Now both the NRC and Edison know better, but have not addressed this issue.

The NRC has not revised its spent fuel dry cask storage system requirements or its aging management plan given the above new realities. They plan to revise it in 2015.

Edison’s plan does not address many major issues. The ratepayers could be set up for another billion dollar boondoggle similar to the steam generator boondoggle where metal tubes failed within one year in a system that was supposed to last 40 years.  We’re facing similar problems with Edison’s decommissioning plan.  However, the consequences could be much worse. The NRC needs to do their job and not approve Edison’s plan.

No technology exists to inspect or repair the thin steel canisters Edison wants to procure. Not even the outside of these thin 5/8” thick canisters can be inspected.

Cracked canisters must be replaced. Edison has allocated no money to replace cracked canisters and these welded canisters were not designed to be opened. Instead, Edison wants to eliminate the spent fuel pools even though this is the only on-site method to transfer fuel into another canister.

No seismic rating for cracked canisters exists. The NRC proposes allowing up to a 75% crack before canisters must be taken out of service. However, cracked canisters have not been evaluated for earthquake conditions. And cracked canisters are not approved for transport.

It is unknown if existing San Onofre canisters are cracked, yet Edison wants to buy more of this same inferior technology and they have no money allocated to replace the existing canisters with better technology, over the many decades they plan to leave them on our coastline.

There is no early warning monitoring system. We won’t know the canisters have failed until after they leak radiation into the environment. If one fails, they all could fail and yet there is no contingency plan for this possibility.

Castor-V-19 cask

Castor V/19 cask

Edison refuses to allow bidding from vendors with the most widely used dry storage technology in the world (e.g., ~20” thick Castor ductile cast iron casks), even though this technology does not have the problems of the thin canisters. Germany, Japan and other countries use thick casks and house them in reinforced buildings for additional environmental and other external hazards. Edison should do this, too.

The NRC has no aging management plan for stress corrosion cracking or other degradation issues with these canisters – either short-term or long term. And they plan to require inspection of only one canister per facility and only of the exterior surface. The NRC is allowing the industry 5 years to develop technology to inspect the exterior for cracks. However, this will be challenging to accomplish, since the steel canisters provide no protection from gamma and neutron radiation, so must be inspected while inside a concrete overpack or concrete cask. If they do find cracks they still have no way to repair them in.

Recommendations

The NRC needs to revise their NUREG-1927, “Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance” [4] before approving a decommissioning plan for San Onofre.

The NRC needs to revise these standards to reflect the best available dry storage technology in the world and not lowered due to the limitations of current U.S. thin steel canister designs. The NRC must not approve this incomplete and inadequate decommissioning plan until all these issues are resolved.  To do otherwise, risks the future of California and threatens the food supply, health and economy of our nation and our families.

Edison should allow vendors with better cask technology to bid on this project. We need a nuclear waste storage system that can be inspected, repaired, and adequately monitored or ratepayers may be on the hook for millions or billions more than collected in the decommissioning fund. Until adequate funds are assured, the NRC should not approve Edison’s plan.

###

PDF printable version of press release (revised)

Footnotes:

[1] NRC webpage: Plans for Decommissioning of San Onofre Nuclear Generating Station Units 2 and 3
[2] Diablo Canyon: conditions for stress corrosion cracking in 2 years, D. Gilmore, October 2014
[3]  Summary of August 5, 2014 Public Meeting with the Nuclear Energy Institute on Chloride Induced Stress Corrosion Cracking Regulatory Issue Resolution Protocol  
[4] NUREG-1927, Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance, March 2011

Decom Fund Assurance 9-26-2013Slide35

Meeting information from the previous NRC public meeting on San Onofre Decommissioning held September 26, 2013:

Meeting summary
http://pbadupws.nrc.gov/docs/ML1332/ML13322A422.pdf
 
Presentations
http://pbadupws.nrc.gov/docs/ML1326/ML13268A003.pdf
 
Meeting Transcript
http://pbadupws.nrc.gov/docs/ML1331/ML13317A029.pdf

About Donna Gilmore

California
This entry was posted in Action Alert, Events, NRC, Nuclear Waste, Press Release, SDG&E, Southern California Edison and tagged , , , , , , , , , , , , , , , , , , , . Bookmark the permalink.

1 Response to 10/27/2014 Carlsbad: NRC San Onofre Decommissioning meeting

  1. Paul Andersen says:

    I ask : why are we who live so nearby the contamination zone having to rehear this same scenario over and over again ? Is this another case of there is no problem until the problem is at our doorstep ? Saving southern Californians from nuclear fallout ought to be to everyone’s advantage, including So Cal Edison. Please do the right thing here and Do It Now !

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s